He additional that Stage 2 would cover the extend within the Lekki next toll gate to the Ajah below-bridge and can be divided into four sections. “Motorists from Ajah inward Lekki is going to be diverted to 1 lane even though repairs are ongoing on the opposite lane,” Osiyemi stated. https://williamr752gil3.jasperwiki.com/user