Penmann has completed a tailored HVAC upgrade at Nutricia’s Liverpool facility, supplying a purpose-built ventilation and climate control system engineered to meet demanding hygiene and production criteria. The contract covered the design, supply, installation and commissioning of advanced HVAC systems across non-production, Medium Care (MC) and High Care (HC) areas. https://bookmarkforce.com/story20745416/penmann-ltd-delivers-comprehensive-hvac-refurbishment-for-nutricia-s-production-facility-in-liverpool-supporting-fsi-phase-1-2